Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13776391
- Product Categories
- Friendly Links
Information Name: | Inorganic lightweight aggregate insulation mortar system flow |
Published: | 2015-06-02 |
Validity: | 30 |
Specifications: | |
Quantity: | 999999999.00 |
Price Description: | |
Detailed Product Description: | Insulation system from inorganic insulation particles mortar, crack the protective layer and facing layer consisting of lightweight aggregate called inorganic insulation mortar system, the distribution can be divided according to the external wall insulation inorganic insulation mortar lightweight aggregate position, external wall insulation , household wall insulation and the ground floor insulation. To strengthen the bond between the grass roots, according to different base materials set interfacial adhesion layer. Inorganic insulation mortar lightweight aggregate has the characteristics of energy saving and waste, fire frost, thermal insulation, anti-aging excellent performance and low price, is an energy-saving building insulation materials fireproof cold in the summer and cold winter area has a wide range of market demand, such as Anhui, Zhejiang, Shanghai, Hubei and other places. Inorganic insulation mortar lightweight aggregate System Process There are two types of processes. The first one, paint finishes exterior insulation engineering process: a primary treatment, acceptance; 2 hanging vertical, set square, playing plaster thickness control line (block); 3 do ash cake, red bars. → brushing interface mortar; 4 Configure insulation mortar; 5 insulation mortar construction; 6 insulation mortar conservation; 7. acceptance insulation; 8 bomb ruled line, ruled install ducts; 9 wipe the bottom cracking mortar ; 10 pressed into alkali-resistant mesh (mounting anchors);. 11 wipe the surface layer cracking mortar; 12 inspection, paint finishes construction. Second, brick veneer exterior insulation works :: 1 primary treatment process and acceptance: 2 hanging vertical, set square, playing plaster thickness control line (block): 3 do ash cake, punch bars: 4 brushing interface mortar: 5 Configure → insulation mortar insulation mortar construction: 6 thermal insulation conservation: 7 Insulation acceptance: 8 bomb ruled lines, sub-grid installation ducts: 9 wipe the bottom crack Mortar: 10 shop reinforcing mesh → Install anchors: 11 wipe the surface layer cracking mortar: 12 Acceptance: 13 paint decorative tiles. Maybe kind of process is basically the same, except that in the latter part of the process. Want to know more attention should dragon can be. |
Admin>>>
You are the 6163 visitor
Copyright © GuangDong ICP No. 10089450, Inner Mongolia Yi Long energy saving Technology Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 6163 visitor
Copyright © GuangDong ICP No. 10089450, Inner Mongolia Yi Long energy saving Technology Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility